We’re a small building firm in Islington. We do extensions, lofts, basements and whole-house restorations, mostly in old terraced houses within twenty minutes of our yard.

6 of 6 sites running · Next start: March 2027

Ashlar

Design & buildLondon N1 · Since 2009

On site now

Highbury Hill, N5

Rear extension

Week 9 of 22
Site manager
Dan Okafor
Phone
07700 900461
Hours
Mon–Fri, 8am–5.30pm

Noise, dust or a van in your way? Ring Dan first. He’d rather hear it from you.

Why we started

I spent fifteen years as a carpenter on other people’s jobs, and the clients I felt for were the ones left chasing, ringing round on a Thursday to find out nobody had been on site since Monday. When Priya and I started on our own in 2009, we decided ours would never have to chase. We’d write everything down and send it to them every Friday, before they asked.

Tom Hale, co-founder

Friday report

This one went to the Barkers at 4.52pm.

Highbury Hill, week 9. Shared with their permission, exactly as Dan sent it.

If it had gone out after 5pm, £100 would have come off their final invoice. It’s in the contract, and it’s happened twice since 2019.

Friday report · Week 9 of 22

On programme

Highbury Hill, N5 · Rear extension

From
Dan Okafor, site manager
To
Kate and Ollie Barker
Sent
Fri 30 Oct, 4.52pm
Site team lifting a steel beam into the new rear wall opening
Tue 27 Oct · second steel going in over the new opening

This week

Both steels went in over the new opening on Tuesday, and building control came out on Thursday and signed them off. The back wall is propped and sheeted, so the house stayed warm and dry through Thursday’s rain.

Next week

  • Bricklayers start the new side wall on Monday.
  • Skip swap on Wednesday morning. The lorry will be on the road for about an hour, and I’ve told Nos. 12 and 16.
  • Roof joists arrive on Friday.

Decision needed by Wed 4 Nov

Rooflight: plain glass, or the one with the slim black frame? Both samples are on your kitchen table. If we order by Wednesday, it’s here for week 13.

Your price

£131,200, unchanged since you signed

Have a good weekend. Dan

Before & after

Elm Row, eight months apart.

Elm Row after the build: a brick rear extension with black steel glazing
Elm Row before the build: a 1970s lean-to and an overgrown garden
Drag or tap to compare
  1. The 1970s lean-to came down; a 4.2 m steel-framed extension went up in its place.

  2. Kitchen moved to the garden side. Ground floor grew from 41 to 64 m².

  3. Garden re-laid in reclaimed York stone, drained properly for the first time in about a hundred years.

How it works

What happens,
and when you pay.

Here’s a typical rear extension, from the first visit to the day we hand it over, with what we’ll need from you along the way and when each payment is due.

Surveyor measuring a back garden with a total station

Weeks 0–2

We come and see your house

We come round for an hour, free, and ask a lot of questions about how you live and what’s driving you mad about the house. If you want to go ahead, we come back and measure everything properly.

What you do

  • Tell us what you want and roughly what you can spend
  • Show us the bits that annoy you about the house

What we do

  • Measure everything and check the structure
  • Tell you honestly if it needs planning permission
You get
A written brief and survey drawings
You pay
First visit free. Survey £950, taken off your build if you go ahead.

Typical extension · 22 weeks in total

Client and architect going through the drawings at a kitchen table

Weeks 2–6

You get one fixed price

We draw it up with your architect, or ours, and Priya prices it line by line, so you can see exactly where the money goes before you sign anything.

What you do

  • Pick finishes from a short, sensible list
  • Approve the drawings when you are happy

What we do

  • Price every item, line by line
  • Plan the build week by week and give you a start date
You get
Fixed price, start date and a week-by-week plan
You pay
10% deposit to book your start date.
A stone threshold being measured before the sliding doors are fitted

Weeks 6–20

We build

One site manager runs your job from the first day to the last, and you get their mobile number.

What you do

  • Answer the odd decision, always with a deadline
  • Carry on living your life

What we do

  • Run the site and keep it tidy every day
  • Price any change in writing before we do it
You get
A report every Friday, with photos
You pay
Monthly, only for work that is already done.
Site manager handing over the keys and the house manual on the doorstep

Week 22

You get your keys

We walk round the finished house with you and write down anything that isn’t right, down to a sticky drawer. Then we come back and fix the lot.

What you do

  • Walk round with us and point out anything you spot
  • Move back in

What we do

  • Fix every snag within 10 working days
  • Hand over certificates and a manual for your house
You get
Keys, building control sign-off, house manual
You pay
Final payment, minus 2.5% we hold until every snag is fixed.
Fitter checking a sliding door track while the owner looks on

10 years

We’re still around for ten years

We ring you at six months and again at a year to ask how the house is behaving. If anything structural goes wrong in the next ten years, we come back and fix it.

What you do

  • Enjoy having a kitchen again
  • Call us if something doesn’t feel right

What we do

  • Check in at 6 and 12 months
  • Fix anything structural, at our cost
You get
10-year insurance-backed warranty
You pay
Nothing.

Still unsure about something? Ring Marta on 020 7946 0321 and she’ll talk you through it

Hannah and James Whitfield in the front kitchen they kept using during the build

In their words

“Dan rang us about a problem with the steel before we’d even noticed anything. That was the week we stopped worrying.”

Hannah & James WhitfieldElm Row, NW3 · Rear extension · 2025

Read 31 more client stories